35 Years
Experience
Sustainable
Technology
Tailor-made
Solutions

Mehr Infos Innovation: Holzstaub statt Braunkohle
CO2-neutrale Asphaltherstellung
Mehr Infos High-Tech Metallpulver
Unter Schutzgas gesiebt, verwogen und verpackt
Mehr Infos Natürliche Aromastoffe
Zuschlagstoffe für Tee fein gemahlen
Mehr Infos Grossanlagentechnik
Zur Herstellung von Holzstaub

Sustainable Plant Solutions – Wood Dust as Fuel

CO₂-neutral fuel for modern asphalt production: As early as 2015, Graf Anlagenbau was the first company WORLDWIDE to convert an asphalt mixing plant to operate on wood dust. With innovative wood dust fuel systems for asphalt mixing plants, Graf Anlagenbau is considered a pioneer and market leader. Furthermore, numerous plants for the production of wood dust as a sustainable replacement for lignite dust have already been delivered – including for other industrial sectors.

Customized Machines & Plants – Everything from a Single Source

Engineering, manufacturing, assembly & service. From planning to commissioning, customers receive completely individual solutions, perfectly matched to the material, process, and industry. No standard machines – real project solutions. Based on our machine range, the perfect processes for customers are developed through the following steps: shredding, grinding, screening, air classifying, mixing, drying, packaging.

Over 35 Years of Processing Experience

Technical precision, process reliability, industrial quality Graf Anlagenbau has been a reliable partner for air classifier technology, fine grinding, mixing, dosing, and conveying systems for decades – with operational safety and high durability. Customized, industry-specific solutions that are consistently aligned with customer needs are the standard at Graf Anlagenbau.

Graf Anlagenbau

Founded in 1990 as a purchasing agency for used machinery, Graf Anlagenbau rapidly developed into a provider of its own machines and complete plant solutions. From the initial brokerage, an independent engineering company emerged step by step – the foundation for the customized processing systems we realize today.

Experience the technology of tomorrow.

Powder technology efficiently conceived.

Selected Applications of Customized Solutions from Graf

Wood dust (RDF) enables CO₂-neutral asphalt production. With the world’s first asphalt mixing plant based on waste wood, Graf Anlagenbau is setting new standards.

The technology used processes wood waste into high-quality fuels that can be reliably used in the solid fuel burner of the mixing drum.

Graf Anlagenbau develops precise processing, screening, and grinding plants for high-quality metal powders and graphite. The plants ensure clean, efficient, and contamination-free processing with consistently high product quality.

Processing under an inert protective gas atmosphere is just as much a part of the product range as solutions for fineness down to 2 µm.

Graf Anlagenbau offers grinding plants with cryogenic cold grinding technology for the food industry. The whirl mill enables particularly material- and aroma-friendly fine grinding and is ideal for spices, herbs, and similar products.

In addition, Graf Anlagenbau supplies turnkey processing lines including raw material feeding and packaging.

Customer Testimonials

  • The plant design and planning with Graf went quickly, as did the coordination with the other project participants. Assembly and commissioning of the plant ran without problems. Since 2024, we have been operating our asphalt mixing plant with wood dust from the Graf processing plant, saving a high six-figure amount in Swiss francs in our fuel costs annually.

    Martin Jost
    Betriebsleiter der Firma Belagswerk Boningen AG, CHE
  • In 2020, the decision was made to convert our asphalt mixing plant from heating oil to wood dust. With Graf, we had a reliable and competent partner at our side who spearheaded the realization of the wood dust production plant and safely guided us through the
    demanding official approval process.
    Since then, the wood dust used has been further developed so that combustion permanently meets the criteria of the new TA Luft. Since commissioning in 2023, we have been producing asphalt with a sustainably produced fuel and successfully
    supplying our customers with it. Interest from the region is growing steadily, so that in the future, supplying a neighboring mixing plant
    with wood dust even seems possible.

    Christian Schweiger
    Inhaber der Firma Schweiger Asphalt, Altomünster, DEU
  • In 2014, we were much-ridiculed pioneers when we converted our asphalt mixing plant to wood dust firing. With Graf Anlagenbau, we had a competent partner who supplied us with the plant for producing the wood dust, as well as the required dust silo system and the fuel dosing for the burner. The plant has been in operation since 2015 and has since saved thousands of tons of CO2 from fossil fuels.

    Werner Schaupp
    Betriebsleiter der Firma Waggershauser, Kirchheim-Teck, DEU
  • As part of our plant expansion at the Düsseldorf site, we also utilized a grinding system from Graf Anlagenbau. The Graf UTM mill has proven to be extremely robust, reliable, and safe in operation. Part of the Graf plant was also a cyclone with an automatic lifting and swiveling device specially developed by Mr. Graf for our application. This allows us to clean the plant quickly and with high ease of use during product changes. The hydraulic opening device for the mill as well as the rotary valves with extractable rotors are also optimal for our plant cleaning requirements during product changes.

    Frank Schrottner
    Leiter Mischungsaufbereitung der Firma Teekanne, Düsseldorf, DEU
  • We supplemented our existing deep drilling rig with a chip processing system featuring a chip shredder and chip conveyors from Graf Anlagenbau. Despite the limited space at our location, the technicians from Graf found an optimal solution. This significantly increased the operational reliability and availability of our deep drilling rig. Graf Anlagenbau has also proven to be a competent and solution-oriented partner during subsequent plant conversions and expansions.

    Horst Griesinger
    Geschäftsführer der Firma B+F Präzisionstiefbohr GmbH & Co. KG, DEU
  • To expand our insulation material production, we purchased a UTM 800 mill from Graf Anlagenbau in 2021. Since then, the machine has been the reliable workhorse and backbone of our insulation manufacturing. Mr. Graf also provided optimal support in integrating the mill into our existing process. The hydraulic opening device of the mill enormously facilitates the operation and cleaning of the machine in daily production.

    Peter Wolfinger
    Inhaber der Firma Wolfinger Zellulosedämmung GmbH, AUT
  • As the first asphalt mixing plant in Switzerland, we equipped our new BWO Wimmis paving plant with wood dust firing. By using moist shredded wood, technical new ground was broken here. As part of this project, Graf supplied the entire wood dust production system, including the drying plant with wood chip heating. The raw material comes from a waste wood collection and recycling company located directly next to us. Thus, we have not only realized low-CO2 paving production but also maximum sustainability in raw material supply.

    Daniel Haldimann
    Betriebsleiter der Firma BWO Belagswerkoberland AG, Schweiz
  • For process optimization on our profile saw, we use G40 chip shredders from Graf Anlagenbau. Thanks to their compact design, the machines could be easily integrated into our existing extraction systems. The machines have been running reliably in continuous operation for years.

    Gerhard Bawidamann
    Leitung Engineering & Instandhaltung der Firma Gartner Extrusion GmbH, Gundelfingen
  • Since 2023, we have been operating our asphalt mixing plant at the St. Pantaleon site with wood dust technology. Graf Anlagenbau GmbH supplied the complete processing technology along with the wood dust dosing into the burner. The flexibility of the Graf plant has proven particularly advantageous, as we can now also process raw materials that were not even known when the plant was designed.

    The support for the approval process was also exemplary.

    Gerhard Greindl
    Projektleiter der Firma Hasenöhrl GmbH, Österreich